EXPERIENCE • OFFSHORE WIND • OWNER'S ENGINEERING


Project Experiences

Immediate execution capability through MWS, marine survey, offshore construction management and advisory services.

MWS / Assurance CSR / Site Method Statement Risk Register
LATEST Doosan Enerbility MBU Replacement

Hallim Offshore Wind Farm — MBU Replacement

ClientDoosan Enerbility Period2026.04 ~ 2026.07 RoleOn-site Technical Guidance and Work Review FocusWork review, lifting condition verification, and execution risk control
  • Core: Stage-by-stage technical review and on-site execution support
  • Control: Pre-verification of lifting and work conditions with risk management
NEW Doosan Enerbility MBU Replacement

Jeju Tamra Offshore Wind Farm — MBU Replacement

ClientDoosan Enerbility Period2026.04 ~ 2026.05.21 RoleOffshore Construction / Technical Support FocusMBU replacement work support, lifting readiness and site execution control
  • Scope: Offshore wind MBU replacement construction support
  • Control: Site readiness, work sequence and safety-critical interface review
NEW Offshore Wind Construction Team

Shinan Ui Offshore Wind Farm — Construction Team Responsible Manager

ClientProject Construction Team Period2026.05 RoleResponsible Manager for Construction Team FocusConstruction coordination, field management and offshore execution support
  • Management: Construction team responsibility during offshore wind project execution
  • Support: Coordination between site activities, documentation and execution readiness
Doosan Enerbility MBU Replacement

Seonam Offshore Wind Farm — MBU Replacement

ClientDoosan Enerbility Period2025.09 ~ 2025.12 RoleOn-site Technical Advisory / Marine Advisory FocusLifting condition review, on-site risk response, and execution control
  • Risk: On-site response to changes in lifting radius and hook position
  • Control: Verification before work and decision-making discipline during execution
K-Bets Method Statement

Guleopdo Wind Farm Project

ClientK-Bets Period2025 RoleMethod Statement Preparation FocusWTG tower, nacelle, blade and transition piece installation methodology
  • Output: Installation method statements for major WTG components
  • Scope: Transition piece and wind turbine installation planning
K-Bets Method Statement

Yokji Jowsar Offshore Wind Farm Project

ClientK-Bets Period2025 RoleMethod Statement Preparation FocusTower, nacelle and blade installation method development
  • Output: WTG installation method statement
  • Focus: Heavy lifting sequence and constructability considerations
K-Bets Foundation Installation

Wando Geumil Offshore Wind Farm Project

ClientK-Bets Period2025 RoleMethod Statement Preparation FocusPin pile, jacket installation, insert pile and grouting methodology
  • Scope: Pin pile, jacket, insert pile and grouting method statements
  • Value: Execution-oriented offshore foundation installation planning
Hyundai Steel & Engineering Construction Management

Jeonnam 1 Wind Farm — Offshore Installation Engineering

ClientHyundai Steel & Engineering Period2022 ~ 2025 RoleConstruction Manager FocusOffshore installation engineering and construction management support
  • Core: Offshore wind construction management experience
  • Focus: Installation planning, site execution and interface control

Track Record

JIK-SEA has built execution-focused experience across offshore wind, survey, construction management, and technical advisory.

Category Track record Client Year Remark
Offshore Wind Jeju Tamra Offshore Wind Farm — MBU Replacement Doosan Enerbility 2026.04 ~ 2026.05.21 Offshore construction / technical support for MBU replacement works
Offshore Wind Shinan Ui Offshore Wind Farm — Construction Team Responsible Manager Project Construction Team 2026.05 Responsible manager for construction team; field management and offshore execution support
Offshore Wind Hallym Offshore Wind Farm — MBU Replacement Doosan Enerbility 2026.04 ~ 2026.07 On-site Technical Guidance and Work Review
Offshore Wind Seonam Offshore Wind Farm — MBU Replacement Doosan Enerbility 2025.09 ~ 2025.12 Technical Advisory, Lifting Review, Execution Risk Control
Offshore Wind Guleopdo Wind Farm Project K-Bets 2025 Method Statement for Tower, Nacelle and Blade Installation, Transition Piece Installation, Wind Turbine Installation
Offshore Wind Yokji Jowsar Offshore Wind Farm Project K-Bets 2025 Method Statement for Tower, Nacelle and Blade Installation
Survey Incheon Orsted Wind Farm Project / Team Manager on the scouting & supporting vessel Ørsted 2026 Pre-survey support
Offshore Wind Wando Geumil Offshore Wind Farm Project K-Bets 2025 Method Statement for Pin pile, Jacket Installation, Insert pile and Pin pile Grouting, Pin pile and Jacket Grouting
Offshore Wind Jeonnam 1 Wind Farm Offshore Installation Engineering Hyundai Steel & Engineering 2022 ~ 2025 Construction Manager
Training Marine Coordination Course (MCC) Korea Electricity Power Corporation 2021-2022 Training Provider: Searoc
Consultancy Offshore Wind Cost Analysis & Planning Korea Electricity Power Corporation 2022 Software Provider: JBA consulting, the UK
Commercial Samsung No.1 30,000 ton crude oil tanker ship sale Geumyong Marine Industries 2021 Ship Sales Agent
Consultancy J-Cable Installation Method / Risk Register Korea Register 2019 Consultancy & Report
Consultancy Offshore sub-station transportation and setting Korea Register 2017
HSE Offshore Wind Farm HSE, Safety Workshop, Planning & Meeting Korea Register 2018~2020 Winning an open tender
MWS / Ops North Korean Coal Smuggling Investigation Resolve Marine Group 2019 UN Sanction for North Korean Fuel Export.
R&D Ship Oil Tank Removal Robot Development Seungwha 2019 Field Test HSE Supervision
Site Study Tanzania Victoria Lake Port Development Sekyoung Construction & Engineering 2020 Africa
Consultancy PETRONAS jacket transportation and installation Bohae Ocean Industries 2019 Site Survey
R&D Oil Platform Jacket Heavy-Lifting Method Development Keosung Tech 2018 Case Study & Report
Saturation Diving CSR KNOC Ulsan Underwater Gas Pipe Lines Replacement CDS Industries 2017 Saturation Diving Operation CSR
Medical Jeju Hospital Emergency Chamber Repair Jeju Hospital 2017 Recompression Chamber Repair
Medical Seogwipo Hospital Emergency Recompression Chamber Repair Seogwipo Hospital 2017 Recompression Chamber Repair
LOC Suitability Survey for heavy transportation LOC Korea 2015 LOC Korea MWS works subcontracted.
Diving Industrial Diving Field Support Daesang Ocean 2015 Spread Inspection, Planning, Site Survey, Auditing, PMS

Field Review

Site judgment and execution readiness are enhanced through practical work review and on-site simulation.

Technical Review 01

Review of working conditions and equipment movement.

Technical Review 02

Review of lifting operations and potential work interference on site.

Technical Review 03

Simulation-based review of key points during execution.