Gochang Offshore Wind Project — MWS Consultant
ClientLT Sambo
Period2026.11.09 – End date TBD
RoleMWS Consultant
Explore our offshore wind installation, replacement, MWS, and site-management experience by project.
Immediate execution capability through MWS, marine survey, offshore construction management and advisory services.
JIK-SEA has built execution-focused experience across offshore wind, survey, construction management, and technical advisory.
| Category | Track record | Client | Year | Remark |
|---|---|---|---|---|
| Offshore Wind | Gochang Offshore Wind Project — MWS Consultant | LT Sambo | 2026.11.09 – End date TBD | MWS consultancy |
| Offshore Wind | Technical Advisory for the WTG T&I Solution Development Project | Doosan Enerbility | 2026.09.01 – 2027.08.17 | Technical advisory for WTG T&I Solution development |
| Offshore Wind | Translation of International Offshore Wind Installation Guidelines (Noble Denton) | Korea Institute of Ocean Science and Technology (KIOST) | 2026.08.24 – 2027.10.24 | Translation of Noble Denton offshore wind installation guidelines |
| Offshore Wind | Shinan Ui Offshore Wind Farm — Construction Team Responsible Manager | Project Construction Team | 2026.05 | Responsible manager for construction team; field management and offshore execution support |
| Offshore Wind | Hallym Offshore Wind Farm — MBU Replacement | Doosan Enerbility | 2026.04 ~ 2026.07 | On-site Technical Guidance and Work Review |
| Offshore Wind | Jeju Tamra Offshore Wind Farm — MBU Replacement | Doosan Enerbility | 2026.04 ~ 2026.05.21 | Offshore construction / technical support for MBU replacement works |
| Survey | Incheon Orsted Wind Farm Project / Team Manager on the scouting & supporting vessel | Ørsted | 2026 | Pre-survey support |
| Offshore Wind | Seonam Offshore Wind Farm — MBU Replacement | Doosan Enerbility | 2025.09 ~ 2025.12 | Technical Advisory, Lifting Review, Execution Risk Control |
| Offshore Wind | Guleopdo Wind Farm Project | K-Bets | 2025 | Method Statement for Tower, Nacelle and Blade Installation, Transition Piece Installation, Wind Turbine Installation |
| Offshore Wind | Yokji Jowsar Offshore Wind Farm Project | K-Bets | 2025 | Method Statement for Tower, Nacelle and Blade Installation |
| Offshore Wind | Wando Geumil Offshore Wind Farm Project | K-Bets | 2025 | Method Statement for Pin pile, Jacket Installation, Insert pile and Pin pile Grouting, Pin pile and Jacket Grouting |
| Offshore Wind | Jeonnam 1 Wind Farm Offshore Installation Engineering | Hyundai Steel & Engineering | 2022 ~ 2025 | Construction Manager |
| Training | Marine Coordination Course (MCC) | Korea Electricity Power Corporation | 2021-2022 | Training Provider: Searoc |
| Consultancy | Offshore Wind Cost Analysis & Planning | Korea Electricity Power Corporation | 2022 | Software Provider: JBA consulting, the UK |
| Commercial | Samsung No.1 30,000 ton crude oil tanker ship sale | Geumyong Marine Industries | 2021 | Ship Sales Agent |
| Consultancy | J-Cable Installation Method / Risk Register | Korea Register | 2019 | Consultancy & Report |
| Consultancy | Offshore sub-station transportation and setting | Korea Register | 2017 | |
| HSE | Offshore Wind Farm HSE, Safety Workshop, Planning & Meeting | Korea Register | 2018~2020 | Winning an open tender |
| MWS / Ops | North Korean Coal Smuggling Investigation | Resolve Marine Group | 2019 | UN Sanction for North Korean Fuel Export. |
| R&D | Ship Oil Tank Removal Robot Development | Seungwha | 2019 | Field Test HSE Supervision |
| Site Study | Tanzania Victoria Lake Port Development | Sekyoung Construction & Engineering | 2020 | Africa |
| Consultancy | PETRONAS jacket transportation and installation | Bohae Ocean Industries | 2019 | Site Survey |
| R&D | Oil Platform Jacket Heavy-Lifting Method Development | Keosung Tech | 2018 | Case Study & Report |
| Saturation Diving CSR | KNOC Ulsan Underwater Gas Pipe Lines Replacement | CDS Industries | 2017 | Saturation Diving Operation CSR |
| Medical | Jeju Hospital Emergency Chamber Repair | Jeju Hospital | 2017 | Recompression Chamber Repair |
| Medical | Seogwipo Hospital Emergency Recompression Chamber Repair | Seogwipo Hospital | 2017 | Recompression Chamber Repair |
| LOC | Suitability Survey for heavy transportation | LOC Korea | 2015 | LOC Korea MWS works subcontracted. |
| Diving | Industrial Diving Field Support | Daesang Ocean | 2015 | Spread Inspection, Planning, Site Survey, Auditing, PMS |









Site judgment and execution readiness are enhanced through practical work review and on-site simulation.
Review of working conditions and equipment movement.
Review of lifting operations and potential work interference on site.
Simulation-based review of key points during execution.