MEASUREMENT • MITIGATION • DIVING • LIFTING • ASSURANCE • MONITORING


The core is not “technology,” but “execution.”

Each capability is organized into site-ready procedures, checks, and evidence.

1) Underwater Noise Measurement
Offshore Construction Noise Measurement

Measurement
Measure and analyze underwater noise generated during offshore wind and marine works (piling, drilling, heavy offshore activities) to assess compliance with regulations and project requirements. Our role
  • Define measurement strategy (location/depth/duration/thresholds) and review the plan
  • Advise on field operation (equipment setup, logging, quality control)
  • Interpret data and report (trends/outliers/evidence-based conclusions)
Deliverables
  • Noise Measurement Report
  • Compliance Assessment / Summary
  • Construction Phase Noise Log

2) Big Bubble Curtain Design & Operation
Noise Mitigation – Big Bubble Curtain

Mitigation
Advise on design, layout, and operation of big bubble curtain systems to achieve noise mitigation targets and minimize operational risk offshore. Our role
  • Review system configuration (air supply, ring, hoses)
  • Develop operating procedures and verify site applicability
  • Confirm performance (linked to measurements) and recommend operational improvements
Deliverables
  • Mitigation Plan / Method Note
  • Operational Checklist
  • Performance Summary

3) Diving Operations & IMCA-level System Audit
IMCA-level Diving System Audit

Diving
Assess diving readiness and safety against IMCA-level expectations for equipment, procedures, and personnel competence. Our role
  • Verify diving spread setup and equipment certification/maintenance records
  • Check procedures, emergency response, and communication systems
  • Identify operational risks and recommend improvements
Deliverables
  • Diving System Audit Note
  • Action List / Close-out Tracking
  • Readiness Checklist

4) Offshore Lifting & Temporary Works Review
Offshore Lifting & Temporary Works Review

Engineering
Review assumptions, constraints, and executability of lift plans and temporary works to manage site-application risk. Our role
  • Lift plan, rigging, COG, lift path 검토
  • Review TW design / installation / removal procedures and clarify interfaces
  • Support change management (impact assessment for field changes)
Deliverables
  • Review Comment Sheet
  • Clarification Note
  • Constraint & Assumption Register

5) High-Risk Marine Operations Assurance
Marine Operations Assurance (High-Risk)

Assurance
Define decision points in advance and support evidence-based, well-recorded on-site judgments for high-risk operations. Our role
  • Pre-job readiness checks (equipment/people/procedures/weather)
  • Define GO/NO-GO criteria and execution control points
  • Recommend immediate actions for site issues and document them
Deliverables
  • On-board Checklist
  • Daily Advisory Note
  • Site Visit Report

6) Instrumentation & Monitoring Strategy
Instrumentation & Monitoring Strategy

Monitoring
Establish an instrumentation and monitoring strategy—what to measure, where, and how—based on project requirements and risk. Our role
  • Define objectives/metrics and develop the measurement plan
  • Design data quality and logging systems and operating methods
  • Align reporting (summary/trends/outliers)
Deliverables
  • Monitoring Plan
  • Data Quality Checklist
  • Reporting Template