MDR • TECHNICAL REVIEW • HSE WORKSHOPS • OFFSHORE CSR

Assurance
that holds!

You won't regret.

1) MDR Setup & Document Control

Build a traceable structure around the IFR/IFA/IFC approval flow and disciplined comment–action–close-out control.

System setup

Define classification, numbering, submittal rules, and approval stages.

Status tracking

Track submissions, comments, resubmittals, and approvals.

Evidence-first records

Ensure traceability ready for verification and audit.

Deliverables
Document Register · Status Log · Review Comment Sheet · Weekly Summary
Focus
Critical documents first (lifting / marine ops / HSE / QA)

2) Technical Review & Comments

Align calculations, assumptions, and procedures into formats that work in real execution.

Lifting & Rigging

Review COG, rigging, lift path, and operational constraints.

Offshore workability

Check executability by layout, sequence, and interfaces—and propose workable methods.

Site issue response

Document alternative scenarios and recommended actions.

Output
Action list · Clarification note · Close-out tracking

3) HSE Workshop Support

Support field-driven hazard identification and the development of effective controls.

ROC / HIRA / HAZOP

Identify hazards by task step and summarize control measures.

Action tracking

Assign action owners → track status → verify close-out.

Field implementation

Link practical tools such as toolbox talks and stop-work authority.

Deliverables
Minutes · Risk register · Action tracker

4) Marine Operation Advisory / Offshore CSR

Accelerate on-site decisions with evidence you can stand behind.

Pre-check

Confirm weather window, constraints, and readiness.

Execution advisory

Make immediate decisions and recommendations based on actual work flow.

Evidence-ready

Keep records via daily notes, visit reports, and checklists.

Typical
On-board checklist · Daily advisory note · Site visit report