Seonam Offshore Wind — MBU Replacement
발주처두산에너빌리티
역할현장 기술자문 / Marine Advisory
포인트붐 처짐 보정, C.O.G 영향 최소화, 즉흥 조정 통제
- 리스크: 리프팅 반경/후크 위치 현장 즉흥 조정의 한계
- 통제: 작업 착수 전 확인·선언·기록 시스템 적용
MWS/해양 서베이/해상공사 관리/해상공사 자문을 통해 즉시 투입 가능한 실행 역량 제공.
| Category | Track record | Client | Year | Remark |
|---|---|---|---|---|
| Offshore Wind | Guleopdo Wind Farm Project | K-Bets | 2025 | Method Statement for Tower, Nacelle and Blade Installation, Transition Piece Installation, Wind Turbine Installation |
| Offshore Wind | Yokji Jowsar Offshore Wind Farm Project | K-Bets | 2025 | Method Statement for Tower, Nacelle and Blade Installation |
| Survey | Incheon Orsted Wind Farm Project / Team Manager on the scouting & supporting vessel | Ørsted | 2026 | Pre-survey support |
| Offshore Wind | Wando Geumil Offshore Wind Farm Project | K-Bets | 2025 | Method Statement for Pin pile, Jacket Installation, Insert pile and Pin pile Grouting, Pin pile and Jacket Grouting |
| Offshore Wind | Jeonnam 1 Wind Farm Offshore Installation Engineering | – | 2022 ~ 2025 | Construction Manager |
| Training | Marine Coordination Course (MCC) | – | 2021-2022 | Training Provider: Searoc |
| Consultancy | Cost Analysis & Planning | – | 2022 | Software Provider: JBA consulting, the UK |
| Commercial | Samsung No.1 30,000 ton crude oil tanker ship sale | Samsung Heavy Industries | 2021 | Ship Sales Agent |
| Consultancy | J-Cable Installation Method / Risk Register | Korea Register | 2019 | Consultancy & Report |
| Consultancy | Offshore sub-station transportation and setting | Korea Register | 2017 | |
| HSE | Offshore Wind Farm HSE, Safety Workshop, Planning & Meeting | Korea Register | 2018~2020 | |
| MWS / Ops | North Korean Coal Smuggling Investigation | – | 2019 | UN Sanction for North Korean Fuel Export. |
| R&D | Ship Oil Tank Removal Robot Development | Korea Institute of Robotics & Technology Convergence | – | |
| Site Study | Tanzania Victoria Lake Port Development | – | 2020 | Africa |
| Consultancy | PETRONAS jacket transportation and installation | Donghae ocean industries | 2019 | Site Survey |
| R&D | Oil platform Jacket Heavy-Lifting Method Development | Keosung Tech | 2018 | Case Study & Report |
| Diving Audit | East Sea Underwater Cable Installation | – | – | Contractor’s Rep. and Diving operation Auditing |
| Medical | Jeju Hospital Emergency Chamber Repair | Jeju Hospital | 2017 | Decompression Chamber Repair |
| LOC | Suitability Survey for heavy transportation | LOC Korea | 2015 | LOC Korea subcontracted. |
| Diving | Saturation Diving Field Support | – | – | Spread Inspection, Planning, Site Survey, Auditing, PMS |